
Charging Rack
Holds 250 robots
First $50, then $75, then $112.5
Bays, the assembly pad, ships and the identity machines.
Each robot makes 2 bars a minute to start with, and the fleet can only carry so many bars away: earnings are the smaller of the two.
A bay holds robots. You have 4 bay slots, and a slot can be upgraded to a bigger bay. Buying the same bay again costs ×1.5 each time.

Holds 250 robots
First $50, then $75, then $112.5

Holds 500 robots
First $500, then $750, then $1.13K

Holds 1.00K robots
First $12.0K, then $18.0K, then $27.0K

Holds 2.50K robots
First $300K, then $450K, then $675K

Holds 7.50K robots
First $30.0M, then $45.0M, then $67.5M

Holds 25.0K robots
First $1.50B, then $2.25B, then $3.38B

Holds 100K robots
First $100B, then $150B, then $225B

Holds 400K robots
First $25.0T, then $37.5T, then $56.3T

Holds 2.00M robots
First $2.00Qa, then $3.00Qa, then $4.50Qa

Holds 10.0M robots
First $150Qa, then $225Qa, then $338Qa
The pad turns charge into robots while you hold it. It refills at 3.25 robots a second to start with, holds 1 min of charge (195 robots), and drains ×5 as fast as it refills while you build.
Ships carry the bars away. You start with 4 ship slots and can reach 12. The cost of a ship grows ×1.5 for each of the same kind you already have.
The Star Train pulls 4 cars (9 with the Train Couplings research), and its rate is for each car.

500 bars a minute
Free

1.50K bars a minute
First $1.00K, then $1.50K, then $2.25K

5.00K bars a minute
First $25.0K, then $37.5K, then $56.3K

15.0K bars a minute
First $1.00M, then $1.50M, then $2.25M

50.0K bars a minute
First $200M, then $300M, then $450M

200K bars a minute
First $50.0B, then $75.0B, then $113B

1.00M bars a minute
First $20.0T, then $30.0T, then $45.0T

5.00M bars a minute per car
First $5.00Qa, then $7.50Qa, then $11.3Qa
Identity machines check each ship at the port. A faster check means more trips, and each machine multiplies fleet capacity.

Port check 4 s · fleet capacity ×1
In place from the start

Port check 2.5 s · fleet capacity ×1.5
Costs $250K

Port check 1.5 s · fleet capacity ×2.25
Costs $2.50B

Port check 0.5 s · fleet capacity ×3.5
Costs $25.0T